What the database includes
The companion database to the printed diagram — the physical reality of the New York subway network, recorded station by station and cross-referenced to the diagram, point for point.
Coverage
Three divisionsDIV A — IRT
188 stations · 19 chains
DIV B1 — BMT
151 stations · 14 chains
DIV B2 — IND
169 stations · 12 chains
49 Line Key entries including branches · 17 historical chains documented separately.
Reading the data
Markers // Divisions // BlanksHow to read a marker
Chaining measures distance along a defined railway alignment from a reference point, its Chain Zero. A marker is written in engineer's notation, where 1+00 is 100 feet.
A marker is not an address or a route number. Always read it with its chain designation: the same number can appear on different chains. Where two chains meet, a transition links the two sets of measurements, but it does not make the numbers interchangeable along either line.
Division is not service
Divisions A, B1 and B2 organize infrastructure by its historical and engineering system. A train's route letter or number (B, 7) describes a service; the chain and track tell you which part of the infrastructure it occupies.
Construction routes vs passenger routes
Construction routes and contracts describe how the network was built. A single passenger service can run through several construction routes and line chains, so the two divide the network differently.
Blank is not "none"
Some fields are absent or pending review. An empty field is not proof that a feature does not exist, and a dash in the table means a value is not displayed — not that it is zero.
Per-station fields
25 fieldsVerified data
Source: signal printsThe original NYCT signal prints are the most accurate source for the physical network. Records are being reviewed against them — and against construction drawings and other technical references, identified by document number — so each value can be traced back to its source.
Verification is under way section by section, line by line, beginning with the Lexington Avenue Line. Verification indicators are coming in a future update, to show which records have been checked and which are still under review.
- CheckedValues read directly from the NYCT signal print for that station
- Under reviewCompiled from secondary engineering records; pending print review
- PrecedenceWhere the two differ, the print wins
System-wide datasets
Every corridor from IRT Contract 1 through modern capital projects: corridor name, assigned line chains, division(s), contract code (C1–C4, TB, IND, BRT, C209…), assigned services, and a written history — 66 of 66 complete.
Name, division, chain, route, borough, above- or under-ground type, and nearest station.
Name, lines governed, location, machine type, territory, and occupancy.
Division, chain, location, tracks, controlling tower, and control type.
Division, connected lines (with cross-division links), borough, year opened, assigned services, train and car capacity, shop tier, shop tracks, total tracks, work-train / car-wash / refuse flags — 511.5 trains of documented storage capacity system-wide.
Every grade of 3.5% or steeper: chain, grade percentage, route, location, year, flagged by severity tier.
East River, Harlem River, Newtown Creek, Beach Channel, Flushing River and more — structure type, approach grade, division, chain, route, year opened.
Rendered in the MTA's standard palette.
Across 11 sections — setup codes, platform codes, eras, contracts, signaling.
Towers & territories
Control // IndicationA tower record describes a signaling and control location and its associated infrastructure. An interlocking is an arrangement of controlled signals and switches that protects conflicting movements. Control and indication are drawn differently on the Towers map: a train inside a tower's indication territory is not necessarily under that tower's control. Boundaries and equipment can change over time.
- Limits of control
- Territory where the tower can exercise control over designated interlocking functions
- Limits of indication
- Territory whose conditions and train movements are visible to the tower, even where control is elsewhere
- Relay room
- An equipment location — not automatically a staffed tower
- Plant / switches
- Infrastructure attributes, read with the applicable signal drawing and its revision
Live data
What it shows // What it can't- Service & trip
- Reported by, or derived from, the MTA real-time feed
- Station / track
- Matched observations or reported track designations, where supported
- Map position
- A placement from known references and rules — not continuous train tracking
- Lead car / consist
- Supplemental vehicle data, when present and matched; not always available
- Tower control
- The mapped relationship between the placed train and the tower's territory
A live marker cannot tell you
- The exact lead-car location between updates
- Signal aspect or switch position
- Track occupancy or authority to move
Missing track references, stale observations or unsupported territories can prevent a train from being placed. A train absent from the map is not necessarily absent from the railroad.
Accuracy & evidence
Five kinds of informationThe database combines engineering and historical records, mapped geometry, interpretation rules and live feeds. These are different kinds of evidence, with different precision, and are best described separately. Maps, including 3D building context, are for orientation: do not use them alone for dimensions, clearance, field work, design or safety-critical decisions.
From a drawing, plan or publication. Note its identifier and date or revision.
A measured position. Note what was surveyed and which reference system was used.
Follows from a rule or inference, not shown directly on a drawing.
A drawn line or position for orientation; avoid reading precision into it.
From an external feed. Note the observation time and how fresh it was.
Not every record yet shows a complete source trail. Where one is missing, treat the record as unverified rather than assuming a source.
Citing the database
When sharing findings, include enough to find the same record again. For technical or historical claims, cite the original document where it is available. Subs.nyc is a research platform, not an official operating or engineering authority.
For live events, add the observation time and whether the train was placed on the map or only present in the upstream feed.
Subs.nyc Physical Network Database, record "<record name>", Div <A/B1/B2>, Chain <chain>, Beta. https://map.subs.nyc/#… Accessed <date>.
Quick glossary
62 terms in the database- Line chain
- Engineering measurement reference along railway infrastructure
- Chain Zero
- Origin of measurements on a designated chain
- Interlocking
- Controlled track and signal arrangement protecting conflicting movements
- Indication
- Information visible to a control location, distinct from control authority
- Consist
- The cars coupled together to form a train
- Lead car
- The car at the leading end for a particular movement
- Terminal code
- Abbreviation read in the context of a specific line or reference sheet
- ATS
- Automatic Train Supervision; an operational information system
- GTFS / GTFS-RT
- Schedule data format, and its real-time updates, used for transit information
Companion to the printed diagram
The database and the printed diagram are built on the same chain system: every line drawn as a measured chain from its zero point, with engineer's-chain markers, junctions where chains meet, and the three divisions distinguished throughout. Database markers cross-reference directly to diagram positions, point for point.