PHYSICAL_NETWORK // BETASUBWAYS_IO. CALCAGNO MAPS
TECHNICAL DATA // PHYSICAL NETWORK DATABASE

What the database includes

The companion database to the printed diagram — the physical reality of the New York subway network, recorded station by station and cross-referenced to the diagram, point for point.

Coverage

Three divisions
508Stations
45Active chains
66Build routes
225Substations
162Interlockings
22Yards

DIV A — IRT

188 stations · 19 chains

DIV B1 — BMT

151 stations · 14 chains

DIV B2 — IND

169 stations · 12 chains

49 Line Key entries including branches · 17 historical chains documented separately.

Board of Transportation contract drawing C-8 for Route 106, Section 5, dated 28 September 1928: cross-sections M-M and O-O of a subway structure showing track centerlines, platform, mezzanine floor, steel columns, tie rods, waterproofing and payment lines for rock and earth excavation.
BOT // Route 106 // Line C // Section 5 // Contract Drawing C-8 // 28 Sept 1928 Full size ↗

Reading the data

Markers // Divisions // Blanks

How to read a marker

Chaining measures distance along a defined railway alignment from a reference point, its Chain Zero. A marker is written in engineer's notation, where 1+00 is 100 feet.

Marker624+50 Reads as624 × 100 ft + 50 ft Distance62,450 ft from that chain's zero ≈ 11.83 mi

A marker is not an address or a route number. Always read it with its chain designation: the same number can appear on different chains. Where two chains meet, a transition links the two sets of measurements, but it does not make the numbers interchangeable along either line.

A chain measured from Chain Zero, with a station at marker 624+50 CHAIN ZERO 0+00 200+00 400+00 STATION 624+50 62,450 ft along the chain
Diamond = Chain Zero // Circle = station reference

Division is not service

Divisions A, B1 and B2 organize infrastructure by its historical and engineering system. A train's route letter or number (B, 7) describes a service; the chain and track tell you which part of the infrastructure it occupies.

Construction routes vs passenger routes

Construction routes and contracts describe how the network was built. A single passenger service can run through several construction routes and line chains, so the two divide the network differently.

Blank is not "none"

Some fields are absent or pending review. An empty field is not proof that a feature does not exist, and a dash in the table means a value is not displayed — not that it is zero.

Per-station fields

25 fields
01Station nameplus former names where applicable
02Line chain & division
03Chain zeromeasurement datum
04Markerengineer's chain at north end · 1+00 = 100 ft
05Distance from zerofeet, computed to miles
06Borough
07Year opened
08Build eraEarly IRT · Dual Contracts · Triboro · BOT · Converted; Rail · TA · MTA · MTA Capital
09Construction routeand route section
10Track count
11MOW typeMaintenance-of-Way track type
12Station typeExpress / Local / Local Type B
13Station setupElevated, Underground, Grade…
14Setup type codeE1–E4 · U1–U6 · G1–G4 · X1–X3
15Platform configurationand platform code P1–P6
16Platform historyoriginal length, extensions, years, contracts
17Thoroughfare widthat street level, ft and m
18Terminal operationStub-End, Relay, Reverse, Spanish…
19CBTC statusand ATS-A status (A-division)
20ADA accessibility
21Height / depthengineering characteristics
22Service historyand former services
23Notesengineering and operational
24Branch designatione.g., Chrystie
25Source & verificationprint reference where identified; verification indicators coming

Verified data

Source: signal prints

The original NYCT signal prints are the most accurate source for the physical network. Records are being reviewed against them — and against construction drawings and other technical references, identified by document number — so each value can be traced back to its source.

Verification is under way section by section, line by line, beginning with the Lexington Avenue Line. Verification indicators are coming in a future update, to show which records have been checked and which are still under review.

  • CheckedValues read directly from the NYCT signal print for that station
  • Under reviewCompiled from secondary engineering records; pending print review
  • PrecedenceWhere the two differ, the print wins
Section of an IND signal print for Line C, upper level, showing tracks C1 to C4 with signals, special work, grade changes from +3.0% to -3.0%, and chain markers from 1607+20 to 1619+00.

System-wide datasets

66Construction routes

Every corridor from IRT Contract 1 through modern capital projects: corridor name, assigned line chains, division(s), contract code (C1–C4, TB, IND, BRT, C209…), assigned services, and a written history — 66 of 66 complete.

225Substations

Name, division, chain, route, borough, above- or under-ground type, and nearest station.

37Master towers

Name, lines governed, location, machine type, territory, and occupancy.

162Relay interlockings

Division, chain, location, tracks, controlling tower, and control type.

22Yards

Division, connected lines (with cross-division links), borough, year opened, assigned services, train and car capacity, shop tier, shop tracks, total tracks, work-train / car-wash / refuse flags — 511.5 trains of documented storage capacity system-wide.

76Track grade segments

Every grade of 3.5% or steeper: chain, grade percentage, route, location, year, flagged by severity tier.

25Water crossings

East River, Harlem River, Newtown Creek, Beach Channel, Flushing River and more — structure type, approach grade, division, chain, route, year opened.

24Color-coded services

Rendered in the MTA's standard palette.

62Glossary terms

Across 11 sections — setup codes, platform codes, eras, contracts, signaling.

Towers & territories

Control // Indication

A tower record describes a signaling and control location and its associated infrastructure. An interlocking is an arrangement of controlled signals and switches that protects conflicting movements. Control and indication are drawn differently on the Towers map: a train inside a tower's indication territory is not necessarily under that tower's control. Boundaries and equipment can change over time.

Limits of control
Territory where the tower can exercise control over designated interlocking functions
Limits of indication
Territory whose conditions and train movements are visible to the tower, even where control is elsewhere
Relay room
An equipment location — not automatically a staffed tower
Plant / switches
Infrastructure attributes, read with the applicable signal drawing and its revision

Live data

What it shows // What it can't
Service & trip
Reported by, or derived from, the MTA real-time feed
Station / track
Matched observations or reported track designations, where supported
Map position
A placement from known references and rules — not continuous train tracking
Lead car / consist
Supplemental vehicle data, when present and matched; not always available
Tower control
The mapped relationship between the placed train and the tower's territory

A live marker cannot tell you

  • The exact lead-car location between updates
  • Signal aspect or switch position
  • Track occupancy or authority to move

Missing track references, stale observations or unsupported territories can prevent a train from being placed. A train absent from the map is not necessarily absent from the railroad.

Accuracy & evidence

Five kinds of information

The database combines engineering and historical records, mapped geometry, interpretation rules and live feeds. These are different kinds of evidence, with different precision, and are best described separately. Maps, including 3D building context, are for orientation: do not use them alone for dimensions, clearance, field work, design or safety-critical decisions.

Documented record

From a drawing, plan or publication. Note its identifier and date or revision.

Surveyed location

A measured position. Note what was surveyed and which reference system was used.

Interpreted relationship

Follows from a rule or inference, not shown directly on a drawing.

Approximated visualization

A drawn line or position for orientation; avoid reading precision into it.

Live observation

From an external feed. Note the observation time and how fresh it was.

Not every record yet shows a complete source trail. Where one is missing, treat the record as unverified rather than assuming a source.

Citing the database

When sharing findings, include enough to find the same record again. For technical or historical claims, cite the original document where it is available. Subs.nyc is a research platform, not an official operating or engineering authority.

For live events, add the observation time and whether the train was placed on the map or only present in the upstream feed.

Example citation Subs.nyc Physical Network Database, record "<record name>", Div <A/B1/B2>, Chain <chain>, Beta. https://map.subs.nyc/#… Accessed <date>.

Quick glossary

62 terms in the database
Line chain
Engineering measurement reference along railway infrastructure
Chain Zero
Origin of measurements on a designated chain
Interlocking
Controlled track and signal arrangement protecting conflicting movements
Indication
Information visible to a control location, distinct from control authority
Consist
The cars coupled together to form a train
Lead car
The car at the leading end for a particular movement
Terminal code
Abbreviation read in the context of a specific line or reference sheet
ATS
Automatic Train Supervision; an operational information system
GTFS / GTFS-RT
Schedule data format, and its real-time updates, used for transit information
The Physical Network Diagram // NYRTIG

Companion to the printed diagram

The database and the printed diagram are built on the same chain system: every line drawn as a measured chain from its zero point, with engineer's-chain markers, junctions where chains meet, and the three divisions distinguished throughout. Database markers cross-reference directly to diagram positions, point for point.